Management & Experience

Lewis Gladwell 

(Managing Director)

  • 16 Years Experience in the Construction Industry
  • 2006 - 2009 Worked as labourer and steel fitter for Roberts and Sale & Network Construction. 
  • 2009 - 2012 Went to Birmingham City University and obtained a 1st class degree with honours in Quantity Surveying.
  • 2012 - 2013 Worked for Enterprise Mouchel as a Graduate Quantity Surveyor on Area 3 for the Highways. 
  • 2014 - 2016 Joined Wates Living Space as Senior Quantity Surveyor for the Abellio Reactive Maintenance framework contract. Also worked as emergency on call supervisor for Dangerous Structures contract to London Consortium. 
  • 2016 - Present Joined Roberts & Sale Construction Ltd as Contracts Manager then Director. 

Previous Projects 

  • Regents Canal Bridge Strengthening
  • Camden Viaduct Fire Repair/ Renewal 
  • Acton Bridge Strengthening 
  • Amhurst Road Emergency Building Demolition 
  • Lincoln Road Bridge Bearing Replacement


Mark Bastow 

(Operations Manager)

  • 44 years in Civil engineering
  • Joined Tarmac Construction in 1976 (now Carrillion ) - Site Engineer
  • 1980 – 1985 - Site Agent - Tom O'Connor Ltd - Groundworks contractor
  • 1985 – 1995 – Managing Director – South East Groundworks
  • 1995 – 1997 – Construction Manager – Forest Construction – London Underground
  • 1997 – 2001 – Construction Director – Toolbase Construction – Set up Rail Division
  • 2001 – 2009 – Director Network (GB) Limited
  • 2009 – Present – Operations Manager and Civils specialist with Roberts & Sale Construction Ltd

Previous projects associated with
Railtrack/Network Rail/London Underground

  • 1995 – 1997 Wash Down Plants and Re-railing to Depots Client: London Underground, Acton Depot, Northumberland Park
  • 1997 - 2001 Station Regeneration Project for Lovell Construction . Client: Network Rail, Station refurbishment, Canopy repairs, platform repairs all general building works
  • 1997 – 2001 Structures Framework Contract – Jackson Civil Engineering – Client: Network Rail, all brickwork and structures repairs, construction of Braintree Freeport Station Platform
  • 2001 – Present Extended arm contract / Structures framework contract Client Network Rail, working for the various framework contractors Jacksons, Jackson Eve, First Engineering and currently Kier Rail on refurbishment and maintenance of various structures, embankments and drainage. Station Refurbishment and platform re-strengthening at Northfleet and Greenhithe Station for May Gurney.
  • 2012 - Present Working on Network Rail framework contract for AMCO completing footbridge refurbishments, signal gantry repairs and emergency response.